logo
último caso de la compañía sobre

Detalles de las soluciones

Created with Pixso. Hogar Created with Pixso. soluciones Created with Pixso.

Line Speed Upgrades Are Changing Bogie Requirements on Existing Railways

Line Speed Upgrades Are Changing Bogie Requirements on Existing Railways

2022-08-29

1) Introduction – A Shift Driven by Speed Upgrades

Across many established railway networks, increasing line speed has become a strategic way to improve capacity without building new infrastructure. While signaling and track upgrades receive much attention, bogie performance is increasingly recognized as a limiting factor when operating speeds rise beyond original design parameters. Existing bogies often struggle to deliver stable running behavior under higher dynamic loads.

2) Application Scenario – Speed Upgrade on Legacy Infrastructure

This case applies to passenger and mixed-traffic fleets operating on legacy railways. Track geometry, curve radii, and infrastructure tolerances remain largely unchanged, while target operating speeds are raised. Bogies designed for earlier service conditions may show increased vibration, reduced stability, and faster component wear.

3) Bogie Solution – Adapting to Higher Dynamic Demands

Kingrail supports speed upgrade programs with railway bogie solutions adapted for enhanced dynamic stability rather than outright redesign. Suspension parameters are optimized to manage higher vibration levels, while the bogie structure is balanced to maintain stiffness without transmitting excessive forces to the track. Compatibility with existing wheelsets and braking systems ensures smooth integration into current fleets.

4) Results and Operational Impact

In many speed upgrade projects, optimized bogies help improve ride stability and reduce vibration-related wear. Operators benefit from smoother vehicle behavior and more predictable maintenance planning, supporting higher operating speeds without disproportionate infrastructure investment.

5) Summary

This bogie solution is suited to operators upgrading line speed on existing networks. It delivers value where infrastructure constraints limit more radical vehicle changes. The next step is to evaluate current bogie performance and work with Kingrail to define an upgrade-oriented configuration.

último caso de la compañía sobre
Detalles de las soluciones
Created with Pixso. Hogar Created with Pixso. soluciones Created with Pixso.

Line Speed Upgrades Are Changing Bogie Requirements on Existing Railways

Line Speed Upgrades Are Changing Bogie Requirements on Existing Railways

1) Introduction – A Shift Driven by Speed Upgrades

Across many established railway networks, increasing line speed has become a strategic way to improve capacity without building new infrastructure. While signaling and track upgrades receive much attention, bogie performance is increasingly recognized as a limiting factor when operating speeds rise beyond original design parameters. Existing bogies often struggle to deliver stable running behavior under higher dynamic loads.

2) Application Scenario – Speed Upgrade on Legacy Infrastructure

This case applies to passenger and mixed-traffic fleets operating on legacy railways. Track geometry, curve radii, and infrastructure tolerances remain largely unchanged, while target operating speeds are raised. Bogies designed for earlier service conditions may show increased vibration, reduced stability, and faster component wear.

3) Bogie Solution – Adapting to Higher Dynamic Demands

Kingrail supports speed upgrade programs with railway bogie solutions adapted for enhanced dynamic stability rather than outright redesign. Suspension parameters are optimized to manage higher vibration levels, while the bogie structure is balanced to maintain stiffness without transmitting excessive forces to the track. Compatibility with existing wheelsets and braking systems ensures smooth integration into current fleets.

4) Results and Operational Impact

In many speed upgrade projects, optimized bogies help improve ride stability and reduce vibration-related wear. Operators benefit from smoother vehicle behavior and more predictable maintenance planning, supporting higher operating speeds without disproportionate infrastructure investment.

5) Summary

This bogie solution is suited to operators upgrading line speed on existing networks. It delivers value where infrastructure constraints limit more radical vehicle changes. The next step is to evaluate current bogie performance and work with Kingrail to define an upgrade-oriented configuration.